![ge proficy historian user manual ge proficy historian user manual](http://www.opssys.com/instantkb/Attachments/ff79db05-1f55-4609-b364-babc.png)
- Ge proficy historian user manual manual#
- Ge proficy historian user manual portable#
- Ge proficy historian user manual software#
All data collection is in accordance with 21 CFR Part 11. The GE Fanuc Proficy Historian is an agent that establishes a connection to an existing GE FANUC. The PCS provides supervisory control and data acquisition (SCADA), batch execution, electronic work instructions, material tracking, equipment management, barcode recognition and creation, historical data collection, and reporting. The system also consists of a number of equipment vendor-supplied control systems and a building management system (BMS). Operators use barcode scanners to verify and record raw materials, semi-finished goods, finished goods, and equipment that is created and/or used in the MBL facility. The PCS provides a MES that includes material tracking, equipment management, barcode recognition and creation, and electronic work instructions (EWI) for execution of process steps in the MBL facility. The PCS stores alarms and process data from the skids and hardwired I/O. The PCS coordinates CIP operations with the CIP skid, controls CIP and WFI distribution, and interfaces with the various equipment vendor-supplied systems over Ethernet. Superior Controls implemented a PCS to control process and cleaning steps for the buffer preparation tank, harvest tank, pH adjustment tank, Q-eluate tank, and nanofiltration tank through hardwired I/O. Vial washer, parts washer, and autoclave.The following equipment is located in the MAb production area: assumes no responsibilities for any errors, omissions or inaccuracies.
Ge proficy historian user manual manual#
Manufacturing Execution System – Elan XFP, Oracle database The information contained in this manual is believed to be accurate and reliable.Data Analysis – GE/Proficy Real Time Information Portal.
Ge proficy historian user manual software#
The following software packages were used as part of the PCS system:
Ge proficy historian user manual portable#
The 11 portable workstations contain wireless Ethernet capability and are mounted on a portable cart with an onboard battery and barcode scanner. The PCS consists of a SCADA/Historian fault-tolerant server, manufacturing execution system (MES) fault tolerant server, web reporting server, 11 portable client workstations, 7 fixed client workstations, and 2 engineering workstations. The PCS communicates approximately 400 data points over Ethernet to the various equipment vendor-supplied systems. The I/O is distributed between 13 control panels which are interconnected with DeviceNet and ControlNet I/O networks.
![ge proficy historian user manual ge proficy historian user manual](https://www.matrikonopc.com/images/drivers/arch_diagrams/opc_server_for_intellution_ihistorian_architecture.jpg)
The monoclonal antibody production centers around cell culture and purification.Į Technologies installed a PLC- and SCADA-based PCS system utilizing redundant Allen-Bradley ControlLogix 5550 processors with 1756 series I/O, 1794 Flex Series I/O, Festo solenoid blocks, and Mettler Toledo scale indicators. The MBL facility performs cell culture and purification of monoclonal antibodies (MAb) and filling of licensed and R&D stage liquid parenteral (injectable) products that cannot be terminally sterilized. E Technologies implemented a $1.8M process control system (PCS) for the Massachusetts Biologic Laboratories (MBL) state-of-the-art facility in Mattapan, MA.